Construction of reinforced cast-in-place concrete bridge abutments on steel piles. The work generally consists of supply and installation of Temporary Detour Bridge, Piles, Rip rap, Concrete Pile caps, Abutment walls, Steel Structural Girders, Approaches, and Concrete Deck with top asphalt
Products specifications
Attribute name | Attribute value |
---|
Category | Bridge Construction Engineering |
Client | J. HANNA Construction Ltd. / Ministry of Transportation |
Location | Highway 97, Chetwynd, BC |
Construction of reinforced cast-in-place concrete bridge abutments on steel piles. The work generally consists of supply and installation of Temporary Detour Bridge, Piles, Rip rap, Concrete Pile caps, Abutment walls, Steel Structural Girders, Approaches, and Concrete Deck with top asphalt