City Centre Pump Station and Forcemain, Coquitlam, BC

The design and construction of the City Centre Pump Station and Forcemain. The work comprises a triplex pump station. The 8 m x 8 m x 4.5 m building is an architecturally designed post disaster control building consisting of timber roof on steel frames on reinforced masonry walls on RC foundation complete with a 300 kW standby generator and motor control centre with foundations for dynamic loads, as well as a 3.66 m diameter FRP wet well, concrete valve chamber and associated fittings and piping. Integral Engineering was responsible for structural deign and providing structural construction services of the structures.

Products specifications
Attribute nameAttribute value
CategoryInfrastructure Facilities
LocationCoquitlam, British Columbia
ClientODK/City of Coquitlam
ArchitectFeenstra Architecture Inc.

The design and construction of the City Centre Pump Station and Forcemain. The work comprises a triplex pump station. The 8 m x 8 m x 4.5 m building is an architecturally designed post disaster control building consisting of timber roof on steel frames on reinforced masonry walls on RC foundation complete with a 300 kW standby generator and motor control centre with foundations for dynamic loads, as well as a 3.66 m diameter FRP wet well, concrete valve chamber and associated fittings and piping. Integral Engineering was responsible for structural deign and providing structural construction services of the structures.

Share this project