The Biological Treatment System Expansion Phase 1 is located at the Chilliwack Wastewater Treatment Plant. The project includes a new aerated bioreactor 40x10x6.5 m reservoir in 4 cells and a secondary clarifier tank. Integral Engineering was responsible for design and providing construction services for all the structural work.
Products specifications
Attribute name | Attribute value |
---|
Category | Infrastructure Facilities |
Location | Chilliwack, BC |
Client | ODK/City of Chilliwack |
The Biological Treatment System Expansion Phase 1 is located at the Chilliwack Wastewater Treatment Plant. The project includes a new aerated bioreactor 40x10x6.5 m reservoir in 4 cells and a secondary clarifier tank.
Integral Engineering was responsible for design and providing construction services for all the structural work.