Chilliwack WWTP Biological Treatment System Expansion Phase 1

ZZL

The Biological Treatment System Expansion Phase 1 is located at the Chilliwack Wastewater Treatment Plant. The project includes a new aerated bioreactor 40x10x6.5 m reservoir in 4 cells and a secondary clarifier tank. Integral Engineering was responsible for design and providing construction services for all the structural work.

Products specifications
Attribute nameAttribute value
CategoryInfrastructure Facilities
LocationChilliwack, BC
ClientODK/City of Chilliwack

The Biological Treatment System Expansion Phase 1 is located at the Chilliwack Wastewater Treatment Plant. The project includes a new aerated bioreactor 40x10x6.5 m reservoir in 4 cells and a secondary clarifier tank.

Integral Engineering was responsible for design and providing construction services for all the structural work.