The Biological Treatment System Expansion Phase 1 is located at the Chilliwack Wastewater Treatment Plant. The project includes a new aerated bioreactor 40x10x6.5 m reservoir in 4 cells and a secondary clarifier tank. Integral Engineering was responsible for design and providing construction services for all the structural work.
Products specifications
| Attribute name | Attribute value |
|---|
| Category | Infrastructure Facilities |
| Location | Chilliwack, BC |
| Client | ODK/City of Chilliwack |
The Biological Treatment System Expansion Phase 1 is located at the Chilliwack Wastewater Treatment Plant. The project includes a new aerated bioreactor 40x10x6.5 m reservoir in 4 cells and a secondary clarifier tank.
Integral Engineering was responsible for design and providing construction services for all the structural work.